Jump to content

ncharles

Members
  • Posts

    47
  • Joined

  • Last visited

Posts posted by ncharles

  1. Team Name: Channarney

    Available Funds: $59,340

    Vehicle Name: Orbit

    Vehicle Parts List and Cost: $23,070

    RC-001S Remote Guidance Unit

    Design Goals: The rocket has enough fuel to launch itself into orbit (70km). Once we are able to establish orbit, we will decouple and put the satellite in a stable orbit around Kerbin.

    Launch Goal:  The vehicle is designed to orbit Kerbin and the put a satellite in a stable orbit.

    Pilot Plan: Launch with boosters and first engine, shed boosters when the run out. Begin turning at 10km and follow the marker on the position ball. One the apoapse is at 80km cut the engine and create node to circularize the orbit. Burn the engine when it says to and orbit is achieved.  Then, decouple and allow the satellite to orbit freely. 

     

     

     

     

  2. Launch Time: 10:50

    Team Members Present: Anna, Nate, Trevor

    Play-by-Play: Everything went smoothly until we attempted to turn into orbit and when we tried the rocket wouldn't turn so the flight failed.

    Photographs: none

    Time-of-Flight: 5:00

    Summary: our goal of a satellite was not achieved.

    Opportunities / Learnings: We need to rethink our original design because the rocket has turned twice in the past two flights, causing them to fail.

    Strategies / Project Timeline: We are going to reattempt the satellite launch.

    Milestone Awards Presented: none

    Available Funds: 80,706-21,420= $59,340

  3. Launch Time: 10:40

    Team Members Present: Anna, Nate, Trevor

    Play-by-Play: Everything went smoothly until we attempted to turn into orbit and when we tried the rocket wouldn't turn so the flight failed

    Photographs: none

    Time-of-Flight: 10:12

    Summary: our goal of a satellite was not achieved

    Opportunities / Learnings: We now know what engine to use to get into orbit

    Strategies / Project Timeline: We are ready get a satellite into orbit

    Milestone Awards Presented: none

    Available Funds:98,908-18,102=80,706

    Team Name: Channarney

    Available Funds: $80,806

    Vehicle Name: Sat 2

    Vehicle Parts List and Cost: $21,420

    Design Goals: The rocket has enough fuel to launch itself into orbit (70km). Once we are able to establish orbit, we will decouple and put the satellite in a stable orbit around Kerbin.

    Launch Goal:  The vehicle is designed to orbit Kerbin and the put a satellite in a stable orbit.

    Pilot Plan: Launch with boosters and first engine, shed boosters when the run out. Begin turning at 10km and follow the marker on the position ball. One the apoapse is at 80km cut the engine and create node to circularize the orbit. Burn the engine when it says to and orbit is achieved.  Then, decouple and allow the satellite to orbit freely. 

    screenshot16.png

  4. Team Name: Channarney

    Available Funds: $98,908

    Vehicle Name: Sat

    Vehicle Parts List and Cost: $18,102

    Design Goals: The rocket has enough fuel to launch itself into orbit (70km). Once we are able to establish orbit, we will decouple and put the satellite in a stable orbit around Kerbin.

    Launch Goal:  The vehicle is designed to orbit Kerbin and the put a satellite in a stable orbit.

    Pilot Plan: Launch with boosters and first engine, shed boosters when the run out. Begin turning at 10km and follow the marker on the position ball. One the apoapse is at 80km cut the engine and create node to circularize the orbit. Burn the engine when it says to and orbit is achieved.  Then, decouple and allow the satellite to orbit freely. 

    screenshot10.png

  5. Launch Time: 10:40

    Team Members Present: Anna, Nate, Trevor

    Play-by-Play: Boosters cut out at 5km and were then shed. The throttle was put to the maximum as the trajectory of the flight was tilted for orbit. Main engine was cut when the apoapsis was at 90km. A 71km by 130km orbit was achieved with enough fuel to return safely. The decent went very smoothly as we deploy the initial parachutes at 420 m/s and the main chute at 220 m/s and landed successfully.

    Photographs: attached

    Time-of-Flight: 22:37

    Summary: our goal of orbit and return was achieved and we are now ready to shoot for the moon!

    Opportunities / Learnings: We now know the amount of fuel we need to get into orbit and return home.

    Strategies / Project Timeline: We are ready to land on the moon

    Milestone Awards Presented: Stable manned orbit ($50,000)

    Available Funds: $48,908 + 50,000 = $98,908

    screenshot2.png

    screenshot3.png

    screenshot8.png

  6. Team Name: Channarney

    Available Funds: $61,470

    Vehicle Name: Trevor

    Vehicle Parts List and Cost: Command Pod Mk1, mk16 Parachute, Heat Shield, TR-18A Stack Decoupler, FL-T800 Fuel Tank, FL-T400 Fuel Tank, LV-T45 Liquid Fuel Engine, LV-909 Liquid Fuel Engine, Mk12-R Radial-Mount Drogue Chute, RT-10 Solid Fuel Booster, Modular Girder Segment XL Total Cost: $12,562

    Design Goals: The rocket has enough fuel to launch itself into orbit (70km). It will still have enough fuel to get out of orbit and return to Kerbin. Then, the heat shield is necessary in order to prevent burn up upon reentry.  The Mk12 chute slows the rocket down to an optimal speed for the mk16 chute to deploy without burning up.

    Launch Goal:  The vehicle is designed to orbit Kerbin and return safely.

    Pilot Plan: Launch with boosters and first engine, shed boosters when the run out. Begin turning at 10km and follow the marker on the position ball. One the apoapse is at 80km cut the engine and create node to circularize the orbit. Burn the engine when it says to and orbit is achieved. To get back, burn retrograde (backwards) until the periapses is less than 35km. Fall into the atmosphere and deploy the chutes when necessary.

     

    screenshot0.png

    Team Name: Channarney

    Available Funds: $48,908

    Vehicle Name: Anna

    Vehicle Parts List and Cost: Command Pod Mk1, mk16 Parachute, Heat Shield, TR-18A Stack Decoupler, FL-T800 Fuel Tank, FL-T400 Fuel Tank, LV-T45 Liquid Fuel Engine, LV-909 Liquid Fuel Engine, Mk12-R Radial-Mount Drogue Chute, RT-10 Solid Fuel Booster, Modular Girder Segment XL Total Cost: $12,562

    Design Goals: The rocket has enough fuel to launch itself into orbit (70km). It will still have enough fuel to get out of orbit and return to Kerbin. Then, the heat shield is necessary in order to prevent burn up upon reentry.  The Mk12 chute slows the rocket down to an optimal speed for the mk16 chute to deploy without burning up.

    Launch Goal:  The vehicle is designed to orbit Kerbin and return safely.

    Pilot Plan: Launch with boosters and first engine, shed boosters when the run out. Begin turning at 10km and follow the marker on the position ball. One the apoapse is at 80km cut the engine and create node to circularize the orbit. Burn the engine when it says to and orbit is achieved. To get back, burn retrograde (backwards) until the periapses is less than 35km. Fall into the atmosphere and deploy the chutes when necessary.

    screenshot1.png

  7. Team Name: Channarney

    Available Funds: $73,232

    Vehicle Name: TOTY Messi

    Vehicle Parts List and Cost: Command Pod Mk1, mk16 Parachute, Heat Shield, TR-18A Stack Decoupler, FL-T800 Fuel Tank, FL-T400 Fuel Tank, LV-T45 Liquid Fuel Engine, LV-909 Liquid Fuel Engine, Mk12-R Radial-Mount Drogue Chute, RT-10 Solid Fuel Booster, Modular Girder Segment XL Total Cost: 11,762

    Design Goals: The rocket has enough fuel to launch itself into orbit (70km). It will still have enough fuel to get out of orbit and return to Kerbin. Then, the heat shield is necessary in order to prevent burn up upon reentry.  The Mk12 chute slows the rocket down to an optimal speed for the mk16 chute to deploy without burning up.

    Launch Goal:  The vehicle is designed to orbit Kerbin and return safely.

    Pilot Plan: Launch with boosters and first engine, shed boosters when the run out. Begin turning at 10km and follow the marker on the position ball. One the apoapse is at 80km cut the engine and create node to circularize the orbit. Burn the engine when it says to and orbit is achieved. To get back, burn retrograde (backwards) until the periapses is less than 35km. Fall into the atmosphere and deploy the chutes when necessary.

    TOTY Messi in hanger.png

  8. Launch Time: 10:40

    Team Members Present: Anna, Nate, Trevor

    Play-by-Play: The throttle was put to the maximum at launch.  The engine cut out at 3km then switched to the next engine to get into orbit. However we did not have enough fuel to get into orbit and we fell back to earth. We landed safely, deploying the chutes when necessary.

    Photographs: none

    Time-of-Flight: 16:12

    Summary: If we had more fuel, we would have made orbit but we didn't.

    Opportunities / Learnings: We now know the amount of fuel we need to get into orbit and return home.

    Strategies / Project Timeline: We are ready to get into orbit.

    Milestone Awards Presented:None.

    Available Funds: $73,232

     

  9. Team Name: Channarney

    Available Funds: $78,094

    Vehicle Name: TOTY Ronny

    Vehicle Parts List and Cost: Command Pod Mk1, mk16 Parachute, Heat Shield, TR-18A Stack Decoupler, FL-T800 Fuel Tank, FL-T400 Fuel Tank, LV-T30 Liquid Fuel Engine, LV-909 Liquid Fuel Engine, Mk12-R Radial-Mount Drogue Chute  Total Cost: $4,862.

    Design Goals: The rocket has enough fuel to launch itself into orbit (70km). It will still have enough fuel to get out of orbit and return to Kerbin. Then, the heat shield is necessary in order to prevent burn up upon reentry.  The Mk12 chute slows the rocket down to an optimal speed for the mk16 chute to deploy without burning up.

    Launch Goal:  The vehicle is designed to orbit Kerbin and return safely.

    Pilot Plan: Launch reach 300 m/s and attain that speed until 10km then return to full throttle. Begin turning east at 10km and gradually reach a 45 degree turn by 50km. First engine should be detached by 20km. Immediately fire the second engine. Once the highest point is at 70km, keep that point about 30 seconds away until the orbit is circular around Kerbin. Then cut the engine. To re enter, turn the rocket and fire in the opposite direction to begin decent. Deploy mk12 chutes at 420m/s and the mk16 chute at 220 m/s for safe landing.

    toty ronny.png

  10. Launch Time: 10:55

    Team Members Present: Anna, Nate, Trevor

    Play-by-Play: The throttle was put to the maximum at launch.  The booster cut out at 500m and then the second engine was fired.  The second engine was cut at 21km .  The rocket reached 74,000 meters but on descent, the parachutes successfully deployed on entry into the atmosphere and we landed safely

    Photographs: See attachements

    Time-of-Flight: 6:23

    Summary: We surpassed 50,00 meters and accidently kept going to 73,000 m.  Then on reentry the parachutes deployed and we landed successfully.

    Opportunities / Learnings: We learned how to use multiple engines in different steps during the mission.  We learned from our mistakes in our previous launch and deployed our parachutes at a more optimal time.

    Strategies / Project Timeline: We are ready to continue flying higher.

    Milestone Awards Presented: 50 manned km reached.

    Available Funds: $48,094. 

    The max height screenshot was deleted on accident.

    tota auba ground.png

  11. Launch Time: 10:50

    Team Members Present: Anna, Nate, Trevor

    Play-by-Play: The throttle was put to the maximum at launch.  The first engine cut out at 18 km and then the second engine was fired.  The second engine was cut at 32,000 meters.  The rocket reached 67,000 meters but on descent, the parachutes burned up and Jebediah died :(.

    Photographs: See attachements

    Time-of-Flight: 5:13

    Summary: Although we surpassed 50,00 meters, reaching almost 70,000 m, our reentry was way too fast, so we were not able to deploy our parachutes in time, causing a huge explosion that unfortunately killed Jebediah.  We are extremely saddened by the loss of our kerbal and we hope that this unfortunate incident does not dampen our mission to bring people to space.

    Opportunities / Learnings: We learned how to use multiple engines in different steps during the mission.  We also learned that we had way too much fuel in the rocket, which caused us to go way to high and to unfortunately crash our ship.  Finally, we learned that upon reentering the atmosphere, the ship begins to decelerate.

    Strategies / Project Timeline: We are ready to reattempt launch by using the information we learned from this failure.

    Milestone Awards Presented: None

    Available Funds: $58,778 (before the costs and penalty).  $52,916.

    Team Name: Channarney

    Available Funds: $52,916

    Vehicle Name: TOTS Auba

    Vehicle Parts List and Cost: Command Pod Mk1, mk16 Parachute, Heat Shield, TR-18A Stack Decoupler, FL-T800 Fuel Tank, LV-T30 Liquid Fuel Engine, Mk12-R Radial-Mount Drogue Chute, RT-5 Solid Fuel Booster .  Total Cost: $4,822.

    Design Goals: The rocket has enough fuel to launch itself to 50,000 m.  Then, the heat shield is necessary in order to prevent burn up upon reentry.  The Mk12 chute slows the rocket down to an optimal speed for the mk16 chute to deploy without burning up.

    Launch Goal:  The vehicle is designed to reach an altitude of 50,000 meters and return safely to the ground.

    Pilot Plan: To launch: Full throttle. When the booster runs out of fuel, detach it.  Then fire the next engine.  Cut the engine at 30,000m.  Then, on descent, deploy the Mk12 at 420 m/s after is has entered the atmosphere and deploy the Mk16 chute when the rocket has reached a downfall speed of 260 m/s.

    tots auba.png

  12. Team Name: Channarney

    Available Funds: $58,778

    Vehicle Name: TOTS Lewa

    Vehicle Parts List and Cost: Command Pod Mk1, mk16 Parachute, Heat Shield, TR-18A Stack Decoupler, FL-T400 Fuel Tank, LV-909 Liquid Fuel Engine, FL-T800 Fuel Tank, LV-T30 Liquid Fuel Engine, Mk12-R Radial-Mount Drogue Chute.  Total Cost: $4,862.

    Design Goals: The rocket has enough fuel to launch itself to 50,000 m.  Then, the heat shield is necessary in order to prevent burn up upon reentry.  The Mk12 chute slows the rocket down to an optimal speed for the mk16 chute to deploy without burning up.

    Launch Goal:  The vehicle is designed to reach an altitude of 50,000 meters and return safely to the ground.

    Pilot Plan: To launch: Full throttle. When the first liquid fuel engine runs out of fuel, detach it.  Then fire the next engine.  Cut the engine at 40,000 m.  Then, on descent, deploy the Mk12 at 420 m/s and deploy the Mk16 chute when the rocket has reached a downfall speed of 260 m/s.

    rocket 2.png

  13. Team Name: Channarney

    Available Funds: $30,000

    Vehicle Name: Naters FC

    Vehicle Parts List and Cost: MK1 Command Pod ($600), MK16 Parachute ($422), RT-5 Solid Fuel Booster ($200)

    Design Goals: The booster is used to help the rocket reach 10,000 meters. The parachute then serves as the drag force to slow the return to the grounf.

    Launch Goal:  The vehicle is designed to reach an altitude of 10,000 meters and return safely to the ground.

    Pilot Plan: To launch: Full throttle.  Parachute deployed at 4,000 m descent.

    Illustrations:

    kerbal.png

    Launch Time: 10:49

    Team Members Present: Anna, Nate, Trevor

    Play-by-Play: The throttle was put to the maximum at launch.  The throttle cut out at 5500 m and the rocket made it to 10800 m.  Parachute deployed 3800 m and landed safely.

    Photographs: See attachements

    Time-of-Flight: 3:50

    Summary: As a result of the launch, we reached 10,000 m with a single booster engine and we returned the kerbel safely back to the ground.  As a result of our success, we are ready to launch to higher heights.  We are proud to have this successful mission so that we can bring reality to space and persevere in our goals.  We hope that people will continue following our journey and support us.

    Opportunities / Learnings: Basic building of rocket and launching techniques.  Also, we saw that the booster can cut out and the rocket can still go higher after.

    Strategies / Project Timeline: We are ready to go higher and attempt to achieve orbit. 

    Milestone Awards Presented: Launched to 10km (10,000) and manned launch to 10km ($20,000)

    Available Funds: $28,778 (before the added award).  $58,778 after awards.

     

    10000.png

    safe.png

  14. Name: Everybody Brought Mass to the Party!
    Category: Dynamics
    Date Added: 2015-09-28
    Submitter: ncharles

    Published on Sep 25, 2015

    Find out when mass cancels out from an equation, which it often will in physics problems.
    Want Lecture Notes? http://www.flippingphysics.com/mass-p...
    This is an AP Physics 1 topic.

    Content Times:
    0:05 1st example
    1:17 2nd example
    1:49 3rd example
    2:25 4th example

    Multilingual? Please help translate Flipping Physics videos!
    http://www.flippingphysics.com/transl...

    Previous Video:
    Does the Book Move? An Introductory Friction Problem
    http://www.flippingphysics.com/fricti...

    1¢/minute: http://www.flippingphysics.com/give.html



    Everybody Brought Mass to the Party!

×
×
  • Create New...